11
Images
ASU dorm demolition
asu-dorm-demolition-best-c-a-excavator-ta-20260429.jpg
The former site of Best B, looking east from Forest Avenue on ASU’s Tempe campus on April 29, 2026. Best C (left) remains standing. (Tim Agne / KJZZ)
asu-dorm-demolition-sign-ta-20260429.jpg
A notice hangs on the temporary fencing as crews demolish the Irish, Best and Hayden dormitories ASU’s Tempe campus on April 29, 2026. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-c-close-up-ta-20260429.jpg
Crews work to demolish the Irish, Best and Hayden dormitories ASU’s Tempe campus on April 29, 2026. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-workers-ta-20260429.jpg
One corner is all that remains of Irish C (back right) as crews work to demolish the Irish, Best and Hayden dormitories ASU’s Tempe campus on April 29, 2026. (Tim Agne / KJZZ)
asu-dorm-demolition-hayden-west-excavator-best-c-ta-20260429.jpg
An excavator works on the remains of Hayden West at ASU’s Tempe campus on April 29, 2026. Best C remains standing in the background. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-b-excavator-best-a-c-ta-20260429.jpg
An excavator removes a lamp post from the wreckage of Irish B on ASU’s Tempe campus on April 29, 2026. Best C (background left) and Best A remain standing. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-a-worker-ta-20260429.jpg
A worker removes part of a window from Irish A on ASU’s Tempe campus on April 29, 2026. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-b-palm-tree-ta-20260429.jpg
A view of the demolition work on Irish B, looking southeast from Lemon Street on ASU’s Tempe campus on April 29, 2026. Irish A still stands in the background. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-c-excavator-ta-20260429.jpg
Crews work to demolish the Irish, Best and Hayden dormitories ASU’s Tempe campus on April 29, 2026. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-b-wreckage-ta-20260429.jpg
The view looking south from Lemon Street over the metal and concrete remains of Irish B and C at ASU’s Tempe campus on April 29, 2026. The Graduate Hotel stands in the background. (Tim Agne / KJZZ)
asu-dorm-demolition-irish-c-overhead-ta-20260429.jpg
An overhead view of the demolition from the Apache Parking Structure at ASU’s tempe campus on April 29, 2026. (Tim Agne / KJZZ)
1/11